The surface layer on the parking lot at the library in Roseville will be removed and replaced with new, smooth pavement. The project will take two weeks and will be done in two stages from September 3 - 13, weather pending.
Work on the north lot is scheduled for September 3 - 9. During this time, the northern entrance and the drive up book drop will be closed. There will be a temporary book drop located in the south lot.
Work on the south lot is scheduled September 10 - 13. During this time the two entrances on this end and the Dunn Bros drive up will be closed.
Curbing repairs for both lots are scheduled for September 3 - 6.